Project Overview

Allclear Demolition, serving as the Principal Contractor, successfully completed the demolition of entire concrete structure building.


Work Challenges & Solutions:

  • Preplanning:

  • Asbestos Surveys: Conducted by a subcontractor to ensure safety and compliance.

  • Recycling: Achieved a high recycling rate of 90% for all materials.

  • Safety Measures: 

  • Sequencing:

  • Coordination: Prioritized tasks to enable smooth soft stripping, and structural demolition in tandem.

  • Toolbox Talks: Conducted weekly briefings with visual plans to maintain clear communication among all site operatives.

  • Structural Demolition:

  • Machinery Use: Deployed 30-tonne and 20-tonne excavators with specialized attachments for efficient demolition.

  • Material Management & Crushing Operations:

    • Recycled and removed materials off-site to relevant recycling stations.

    • Crushed all suitable arisings to produce 6F2 aggregate, stockpiling on-site for future reuse.