LATEST NEWS & CASE STUDIES


CASE STUDY : Arla, Lockerbie
Project Overview We were contracted to carry out the strip out and internal demolition works at the Arla dairy plant in Lockerbie at the end of 2025. This site was officially opened in 1975 and is one of the the UK's largest dairy processing facilities. In 2025 Arla made the decision to invest £144 million pounds into this existing site, and engaged with Allclear to get the site enabling works prior to their refurbishment works. Throughout the process of our works, this facto


CASE STUDY : Northern House, York
Project Overview We were contracted to carry out the demolition of an existing 1960’s office block, which was constrained at three sides by party walls and occupied buildings. In central York, the property is located adjacent to the main bus exchange and public realm, which needed protecting. The works consisted of demolition of the concrete frame and brick façade, along with foundations before processing the demolition arisings for reuse on site and export. Key Project Steps


CASE STUDY : Canal Mills, Armley Road, Leeds
Project Overview Allclear Demolition services completed the above project in July 2025. Canal Mills was an 18th century textile mill building, located alongside the Leeds & Liverpool Canal, that was unfortunately fire damaged and required, site clearance, unsafe timber and steel roof structure removal, specific structural demolition and making safe site boundary elevations. Key Project Steps Pre-Planning Various site visits with the client to assess the structures, the


CASE STUDY : Leeds City College, Mabgate, Leeds
Project Overview November 2023 Allclear Site Services began the technical task of demolishing a large area of 18 th century woollen...


CASE STUDY : Former Henshaw Ltd, Russell Road, Edinburgh
Project Overview Late June 2025 Allclear Demolition Services began the task of the complete structural demolition of former industrial...


CASE STUDY : Former Hitachi Tools, Milton Keynes
Project Overview December 2024 Allclear Demolition began the task of demolishing three large warehouse structure previously used as a...


CASE STUDY : Wheatley Retail Park, Doncaster
Project Overview Early November 2024 Allclear Demolition began the task of the complete internal strip out back to shell of retail units...


CASE STUDY : Norwich Home Bargains
Project Overview Late February 2024 Allclear Demolition began the refurbishment task of merging two existing industrial units together to...


CASE STUDY : Norwich Toys 'R' Us
Project Overview Allclear Demolition recently undertook a challenging project within a live retail space, successfully managing extensive...