CASE STUDY : Former Henshaw Ltd, Russell Road, Edinburgh

  • jackie9539
  • Sep 12
  • 2 min read
ree

Project Overview

Late June 2025 Allclear Demolition Services began the task of the complete structural demolition of former industrial premises of warehouse type structures followed by the partial breakout of specific areas of ground bearing slab.


Key Project Steps

Pre-Planning

  • Asbestos Surveys: Conducted areas of licenced removal works along with large areas of asbestos corrugated cement roof sheets removed prior to structural demolition.

  • Sequencing: Working alongside Mandale Group’s designated structural engineer, Allclear Demolition Services established a methodical sequence of works to ensure smooth coordination of asbestos removal, soft stripping, and technical sequenced structural demolition.


Asbestos Cement Roof Sheet Removal:

  • Approx 2,400m2 single skin and double skin asbestos roof sheets were initially removed by operatives working from within MEWP scissor lifts in preparation for structural demolition.


Internal Soft Stripping:

  • Internal soft strip out of anything not structurally integral to the building were removed, including fixtures and fittings, floor coverings, suspended ceilings, bulk heads, partition walls and M&E


Structural Demolition:

  • Pre-planning and sequencing was vital prior to structural demolition throughout these works

  • Equipment Utilization: 30-tonne and 20-tonne excavators with a variety of attachments for were utilised for efficient demolition.


Waste Material Removal:

  • Utilising excavator with hydraulic breaker attachment, existing concrete hardstanding were broken out and removed from site.


Achievements:

  • Ahead of Schedule: Completed the project one week earlier than scheduled.

  • Leadership: Demonstrated outstanding planning, coordination, and communication throughout the project.

  • Client Commendations: Our client raised comment on Allclear Demolition’s efficiency to complete the tasking within the timescale proposed given the amount of arisings removed, dismantled and disposal from site


This project highlights Allclear Demolition’s expertise in handling complex demolitions within live environments, ensuring safety, efficiency, and sustainability throughout the process.