Location
Kings Court, 12 King Street, Leeds, LS1 2HL
Value
£200,000
Project Description
Allclear undertook the removal / refurbishment works at the above site, which is in central Leeds, a busy City Centre location. The building was used as an office premises and Allclear removed the top two floors and structural alterations throughout.
General Scope of Works
Removal of top 2 floors including the roof.
Removal of all windows.
Removal of toilet walls throughout.
Removal of all fire proofing to steels, including shot blasting.
Removal of all brick / block to front façade, full height on corner of King Street / Quebec Street and all paved area including planters.
Removal of all brickwork as identified.
Removal of carpet to stairwells.
Remove waste arising to the relevant licensed waste disposal facility.
Commencing the works:
Working as a Sub-contractor to GMI; we assessed the specialist plant required on site, and organised transportation of same, including skid steers, mini excavators, Brokk Robotic Plant, transportation, labour, and site management.
Liaising with local authority and assisting with preparing relevant notices / permits etc.
Carried out the temporary works to facilitate the specialist contractors required on site (Tower Crane, Robotic Demolition, Diamond Concrete cutting).
Comments